Project Details

All Projects

Construction of a 220/110/10 kV Substation and Two 220 kV Transmission Lines in Andijan Region

2023
image

Client: Andijan Main Electric Networks Branch of JSC "National Electric Networks of Uzbekistan"

In 2023, JSC "O'ZENERGOINJINIRING" developed the design for the construction of a 220/110/10 kV substation and two 220 kV overhead transmission lines using the in-and-out connection scheme from the Turakurgan TPP – Yulduz Substation 220 kV transmission line in the Andijan Region.

The project is designed to enhance the reliability of the regional power supply system, increase transmission capacity, connect new consumers to the grid, and support the continued development of the region's power infrastructure.