All Projects
Construction of the Sergeli 150 MW / 300 MWh Battery Energy Storage Power Plant with Reconstruction of the 220/110 kV Outdoor Switchyard at Sergeli Substation
2026
Client: LLC "Sinohydro Tashkent". Development of design documentation for the construction of a 150 MW / 300 MWh Battery Energy Storage System (BESS) at Sergeli, including the reconstruction of the 220/110 kV outdoor switchyard (OSY) of Sergeli Substation. The project covers electrical system design, power evacuation scheme, relay protection and automation (RPA), substation automation, single-line diagrams, equipment specifications, engineering calculations, and related technical documentation. Status: In progress.