300 MW Solar Photovoltaic Power Plant and 150 MW / 300 MWh Battery Energy Storage System (BESS) Hybrid Power Plant in Navoi

2026
image
+6

Client: China Energy Engineering Group Xinjiang Electric Power Design Institute Co., Ltd. Development of design documentation for a hybrid renewable energy project consisting of a 300 MW Solar Photovoltaic (PV) Power Plant and a 150 MW / 300 MWh Battery Energy Storage System (BESS) in Navoi Region. The scope includes power evacuation studies, electrical system design, relay protection and automation (RPA), substation automation, single-line diagrams, equipment specifications, engineering calculations, and related technical documentation. Status: In progress.